Track Ocean Breeze from blueprint to landmark, milestone by milestone, from 2025 to 2030.

PROGRESS IN MOTION

This Month

Follow the latest construction updates, completed milestones, and key developments taking shape at Ocean Breeze.
Multiple floors and the main structure are now taking shape.
24.11.2026
Core structural work continues across the building.
24.11.2026
Upper levels are taking shape with views toward the coastline.
24.11.2026

LOOKING BACK

Monthly Archive

Explore previous updates, milestones, and progress stories from Ocean Breeze.

PROGRESS IN MOTION

Development Overview

Follow the latest construction updates, completed milestones, and key developments taking shape at Ocean Breeze.

PHASE 1

Foundation & Structural Development

(2025–2026)
This phase establishes the core foundation of Ocean Breeze, covering site preparation, excavation, piling, and structural construction of the hotel. The work focuses on building a strong, durable structure that supports the project’s long-term vision.
100%
Status: Work completed
Site preparation & soil stabilization
Pile foundation completion
Ground & basement structure
Superstructure development
Quality testing & inspections

PHASE 2

Vertical Build & Core Systems

(2026–2027)
This phase focuses on completing the hotel’s main structure and integrating essential building systems. As Ocean Breeze rises floor by floor, key vertical elements, service infrastructure, and core installations will move toward completion.
70%

Status: Structural development progressing toward core completion

Main structural frame completion
Elevator shafts and stair cores
Mechanical and service infrastructure
Plumbing and electrical installations
Wall finishing and internal plastering
Terrace and balcony waterproofing

PHASE 3

Finishing, Interiors & Guest Experience

(2028–2029)
As the structure reaches completion, this phase focuses on transforming Ocean Breeze into a fully operational hospitality destination through interior finishing, building systems, facade detailing, and guest amenities.
Status: Planned to commence in Early 2029
HVAC, electrical, plumbing & fire safety systems
Exterior facade, glazing & architectural detailing
Guestroom flooring, ceilings, lighting & carpentry
Public areas and hospitality spaces finishing
Rooftop pool, restaurant & recreational facilities

PHASE 4

Interior, Landscape & Final Works

(2029–2030)
This final phase brings Ocean Breeze closer to completion, with a focus on interior fit-outs, landscaping, guest amenities, and final finishing works. It covers the details that shape the guest experience, while ensuring key facilities, systems, and shared spaces are fully prepared for hotel operations.
Status: Final Completion — Target: 2030
Status: Final Completion — Target: 2030
Gardens, pathways & landscape development
Pool, wellness & recreation areas
Final painting, signage & wayfinding
Testing, inspections & system commissioning
Exterior detailing & site beautification
Safety checks & operational readiness

PROGRESS IN MOTION

Development Overview

Follow the latest construction updates, completed milestones, and key developments taking shape at Ocean Breeze.

PHASE 1

Foundation & Structural Development

(2025–2026)
This phase establishes the core foundation of Ocean Breeze, covering site preparation, excavation, piling, and structural construction of the hotel. The work focuses on building a strong, durable structure that supports the project’s long-term vision.
100%
Status: Work completed
Site preparation & soil stabilization
Pile foundation completion
Ground & basement structure
Superstructure development
Quality testing & inspections

PHASE 2

Vertical Build & Core Systems

(2026–2027)
This phase focuses on completing the hotel’s main structure and integrating essential building systems. As Ocean Breeze rises floor by floor, key vertical elements, service infrastructure, and core installations will move toward completion.
70%
Status: Structural development progressing toward core completion
Main structural frame completion
Elevator shafts and stair cores
Mechanical and service infrastructure
Mechanical and service infrastructure
Wall finishing and internal plastering
Terrace and balcony waterproofing

PHASE 3

Finishing, Interiors & Guest Experience

(2028–2029)
As the structure reaches completion, this phase focuses on transforming Ocean Breeze into a fully operational hospitality destination through interior finishing, building systems, facade detailing, and guest amenities.
Status: Planned to commence in Early 2028

HVAC, electrical, plumbing & fire safety systems

Exterior facade, glazing & architectural detailing
Guestroom flooring, ceilings, lighting & carpentry
Public areas and hospitality spaces finishing
Rooftop pool, restaurant & recreational facilities

PHASE 4

Interior, Landscape & Final Works

(2029–2030)
This final phase brings Ocean Breeze closer to completion, with a focus on interior fit-outs, landscaping, guest amenities, and final finishing works. It covers the details that shape the guest experience, while ensuring key facilities, systems, and shared spaces are fully prepared for hotel operations.
Status: Final Completion — Target: 2030
Furniture, fixtures & equipment installation
Gardens, pathways & landscape development
Pool, wellness & recreation areas
Final painting, signage & wayfinding
Testing, inspections & system commissioning
Exterior detailing & site beautification
Safety checks & operational readiness

Curious about Ocean Breeze?